New-build & extension first-fix
Cabling, back-boxes, containment, consumer unit second position, chases and fire-stopping done ahead of plaster and finishes.
Turn a set of drawings, or a rough brief, into a certified, tested electrical installation that meets 18th Edition and passes building control first time. First-fix to second-fix, planned, coordinated, and quoted written within 48 hours.
18th Edition · 12-month guarantee
What the service is, who it's for, when it's needed, and why professional work matters.
Design and build electrical installation covers new circuits, containment, distribution, lighting, small power and specialist supplies, designed to brief, installed to BS 7671, and certified on completion. From new-builds and extensions to full refurbishments, retail fit-outs and industrial units.
Self-builders, extension owners, developers, main contractors, architects, kitchen designers and business owners who need an electrical installation built from scratch or overhauled comprehensively.
New-build projects, single- and two-storey extensions, loft conversions, garage conversions, kitchen renovations, complete rewires paired with extensions, retail and office fit-outs, and industrial unit refits.
Electrical installations that are designed properly from day one cost less, look tidier and last longer. Coordinated first-fix with builders and plasterers avoids the classic 'we'll chase it in later' mess that wrecks finishes and blows budgets.
Unplanned installations always cost more, either at the point of finish, or six months later when circuits are overloaded and rooms don't have the sockets you actually needed.
Meet on site, walk the drawings (or sketch them out if there aren't any), agree scope, socket layouts, lighting design and switching.
Circuit design, load calc, consumer unit specification and containment plan to 18th Edition.
Fully itemised quote covering first-fix, second-fix, testing and certification. No hidden extras.
Cables, back-boxes, containment and rough-in installed before plaster and finishes go on. Coordinated with builder and plasterer.
Fittings, switches, sockets, lighting, distribution board wire-in and appliance connections.
Full 18th Edition testing, Electrical Installation Certificate issued, NAPIT notification submitted, and 12-month workmanship guarantee in writing.
Design decisions made upfront rather than on installation day, no expensive retro-fits.
First-fix timed properly with builder, plasterer and plumber so nothing gets damaged or reworked.
Every circuit designed, installed and tested to current wiring regulations.
Proper certification and NAPIT notification for sign-off and future property sale.
Full year workmanship cover in writing on every installation.
Same electrician quotes, installs, tests and hands over, end to end.
Design and build sits between reactive maintenance and pre-drawn commercial fit-out. It's where the electrician takes real responsibility for the electrical design, not just installing someone else's drawings.
Cabling, back-boxes, containment, consumer unit second position, chases and fire-stopping done ahead of plaster and finishes.
Ring and radial circuits for appliances, dedicated cooker/oven/hob supplies, under-cabinet lighting, feature pendants, socket layout planned to actual worktop use.
IP-rated zone-compliant lighting, extraction, shaver sockets, electric showers up to 10.5 kW, coordinated with tiler and plumber.
New sub-mains where required, sub-boards, lighting, small power, heating controls and data cabling, all certified to 18th Edition.
Small power, lighting, EPOS supplies, dedicated circuits, containment, distribution board sizing and coordination with main contractor.
Three-phase distribution where applicable, machinery supplies, isolators, lighting layouts and small power design.
SWA armoured supplies, sub-boards, outdoor lighting, weatherproof sockets, EV chargers and hot-tub feeds.
Full 18th Edition inspection and testing, Electrical Installation Certificate, and NAPIT Part P notification where required.
Domestic installs sit under Building Regs Part P, notifiable works must be registered by a competent scheme. Attention goes to zone rules in bathrooms and kitchens, socket ergonomics and dimmable lighting design.
Commercial installs add RAMS on request, permits, coordinated shutdowns and often three-phase distribution, EPOS, refrigeration and machinery supplies.
Yes; we take briefs and drawings, do the load calcs, design the circuits and consumer unit, then install, test and certify.
Yes. First-fix timing is agreed with the builder and plasterer so nothing gets damaged or reworked.
Yes. Every installation leaves with an Electrical Installation Certificate and NAPIT notification where required.
Fixed, written, itemised quotes, free, returned within 48 hours (size-dependent for larger projects).
Yes, where the incoming supply supports it. We size distribution and specify machinery supplies as part of the design.
A single-storey extension first-fix is usually 1–3 days, second-fix another 1–2 days after finishes. We'll give firm dates in the quote.
Yes, 12 months in writing on every installation.
Leicester, Hinckley, Market Bosworth, Barlestone, Nuneaton, Coalville, Earl Shilton, Burbage, Ashby-de-la-Zouch and surrounding towns. Larger commercial projects nationwide.
Based in Barlestone, working across Leicester, Hinckley and the surrounding towns.
Tell Jacob what you need. He'll come out, look at the job properly, and send a clear written quote, no obligation, no chasing, no call-centre nonsense.